Skip to content
Free violation report for any NYC building · Check an address

HPD violation removal

HPD’s Emergency Repair Program: why the bill is high, how it becomes a lien, and how to avoid it

How HPD’s Emergency Repair Program (ERP) works: which violations trigger it, how charges are billed through the Department of Finance, when they become tax liens, and how to avoid them.

Published 10/17/2026 · 5 min read · By Bulwark

When an owner does not correct a dangerous condition in time, HPD can send its own contractor to do it and bill the building. The work is usually basic. The bill usually is not, and if it goes unpaid it becomes a tax lien that can be sold.

What triggers emergency repairs

  • HPD Class C, immediately hazardous violations, and HPD orders: no heat or hot water, lead paint hazards, mold, defective plaster and roofs, among others
  • DOB orders and Declarations of Emergency, including emergency demolition and sidewalk sheds
  • Certain elevator violations referred by DOB
  • Health Department Commissioner’s Orders, such as an order to abate lead after a child’s blood test

HPD’s own City Record notices show how far this goes: emergency demolitions and sidewalk sheds at specific addresses are procured every week, and every one of them is billed to the property.

Why it costs more than doing it yourself

HPD’s contractors are hired under city procurement, contracting and prevailing-wage rules, and HPD says plainly that its work can be significantly more expensive than what an owner would pay a contractor directly. On top of the contractor’s price come HPD’s fees, and HPD bills even for the cost of initial attempts when its contractor could not finish the work.

How the bill reaches you

  1. Work order

    HPD issues a work order. Active and completed orders appear on HPD Online, on the building’s Charges tab, before any bill is sent.

  2. Department of Finance

    Once the contractor is paid, the charge goes to Finance and appears on the property tax statement of account.

  3. Tax lien

    A past-due HPD repair charge is a tax lien. It bears interest and can be sold in the city’s lien sale or foreclosed.

How to avoid it

  • Correct HPD violations and orders inside the deadline and certify the correction to HPD in time. A corrected but uncertified violation still looks open, and still invites HPD’s contractor.
  • Comply with DOB and Health Department orders as the issuing agency directs
  • Keep your HPD registration current so HPD’s calls about emergencies reach someone who can act
  • Check the Charges tab on HPD Online regularly; an active work order is the last warning before a bill. HPD lists phone numbers for questions on active orders: lead, mold, roofs and plaster (212-863-5526), Alternative Enforcement Program (212-863-8262), DOB-ordered demolition (212-863-6722), all others (212-863-6335).

Already billed?

Review the charge against the work order: was the work done, at your building, on the condition in the violation? Pay or dispute before the charge goes past due; once it is a lien, interest and the lien sale make every option more expensive. If the violations behind it are still open, clear them so the next charge never starts.

HPD violation removal covers correction, certification and dismissal of the violations that lead to ERP charges. The HPD violation classes guide explains deadlines by class.

Need this handled?

HPD violation removal is one of our services. We quote in writing within two business days.

Brooklyn, NY

Talk to us about your building

Tell us what you own and what needs fixing. A person replies within one business day.

Photo: Andre Carrotflower, CC BY-SA 4.0
WhatsApp us