Skip to content
Free violation report for any NYC building · Check an address

Manhattan · Chelsea

112 11 Avenue, Chelsea, Manhattan: Violations and Building Information

This building has open records with New York City agencies. The full report, with every item, is sent to you by email as a PDF.

The full report, by email

Every open item on 112 11 Avenue, with dates, hearing dates, penalties and status, plus the closed history. The report is never shown on this website; it is sent to the email you enter.

  • HPD, DOB, ECB/OATH, FDNY, DEP, Sanitation and Health records
  • Source dataset beside each figure
  • Free; we never sell your details

Email me the full report

Please fill this in.
Please fill this in.
Please fill this in.
Enter a mobile number above for texts, or untick the box.

Want to know when something new is filed here? Get free alerts for this building.

About 112 11 Avenue

112 11 Avenue is a government building in Chelsea, Manhattan, built in 1931, with 2 units, on 8 floors. The lot is 15,800 sq ft, zoned C6-3 / C6-2.

Building type
Government building (class Y3)
Year built
1931
All units
2
Floors
8
Building floor area
95,837 sq ft
Lot area
15,800 sq ft
Zoning
C6-3 / C6-2 · special district WCh
Floor area ratio
6.07 built of 10.00 allowed
Programmes and lists
HDFC (Article XI) · HPD affordable project · Sidewalk shed / scaffold up · LL97: emission limits from 2024 · LL87 energy audit · LL88 lighting
BBL
1006910001

Zoning allows more floor area than the building uses: roughly 62,094 sq ft of unused development rights on paper. Zoning bonuses, overlays and lot conditions change the real number; an architect should confirm it.

From the city’s tax-lot records (DCP PLUTO), DOF, HPD, DOB and HUD programme lists. Zoning map for this lot.

NYC rules that apply here

Based on the building’s size, age and type. These apply whether or not anything is open.

  • HDFC (Article XI)A Housing Development Fund Corporation under Article XI of the NY Private Housing Finance Law: usually a limited-equity co-op that the city sold to its tenants, or a non-profit-owned affordable building. Run by a resident board, usually volunteers, so the compliance calendar is the board’s job and often falls behind. The property-tax exemption is tied to a regulatory agreement with HPD, which can step in if the building is mismanaged or in distress.
  • HPD affordable projectBuilt or preserved with HPD financing or incentives since 2014 (HPD Affordable Housing Production). A regulatory agreement sets income bands and rents for the counted units. Vacancies are generally filled through Housing Connect, with income certifications.
  • Sidewalk shed / scaffold upAn active DOB NOW permit for a sidewalk shed, scaffold or construction fence. A shed is a monthly rental cost, and one that stays up for years usually means facade repairs are stalled. The permit has to be renewed while the shed stands; an expired shed permit is a violation.
  • LL97: emission limits from 2024On DOB’s Local Law 97 list under Article 320: emission limits since January 1, 2024, report every May 1.
  • LL87 energy auditOn DOB’s Local Law 87 list: an energy audit and retro-commissioning report every ten years, the year set by the block number’s last digit.
  • LL88 lightingOn DOB’s Local Law 88 list: lighting in non-residential and common spaces had to meet code by January 1, 2025 (and tenant submeters in the largest buildings), with a report to DOB.
  • Gas piping inspection every four years (Local Law 152)Every building except one- and two-family homes; the year depends on the community district. Read the guide
  • Façade inspection every five years (FISP / Local Law 11)Taller than six stories, so a qualified inspector must examine the exterior walls every five years and file with DOB. Read the guide
  • Energy benchmarking and Local Law 97About 95,837 sq ft, over the 25,000 sq ft line: Local Law 84 benchmarking and the Local Law 97 emissions report are due May 1 if the building is on the covered list. Over 50,000 sq ft, a Local Law 87 energy audit is due every ten years. Read the guide
  • In a flood zoneInside the 1% annual-chance flood zone on FEMA’s 2015 preliminary maps. Substantial work must meet flood-resistant construction rules, and lenders may require flood insurance.

How NYC violations are cleared

HPD violations

Housing code violations in three classes: C (immediately hazardous, such as no heat or lead paint), B (hazardous) and A (non-hazardous). Each is closed by correcting the condition and certifying the correction to HPD within its deadline.

HPD violation classes and how to clear them

DOB violations and ECB summonses

Building code items such as boilers, elevators, gas piping and facades. DOB violations block permits and Certificates of Occupancy until dismissed; ECB summonses also carry a hearing and a penalty.

How to remove a DOB violation

Other OATH summonses

Sanitation, environmental, health and fire-code summonses are heard at OATH. Each has a hearing date, and a missed hearing becomes a default at the maximum penalty.

OATH / ECB hearing guide

Want it handled? Manhattan violation removal · HPD violation removal · DOB and ECB violation removal · Property management in Chelsea

Source: NYC Open Data, compiled by Bulwark and last refreshed 10/24/2026. Records can lag the agencies’ own systems by a day or more. Owner and registration contact details are not shown on this page.

Email me the full report

Brooklyn, NY

Own or manage this building? We can clear the open items

Call (888) 756-7874 or get the free full report by email. Then we quote a fixed price for the clearance.

Photo: Andre Carrotflower, CC BY-SA 4.0
WhatsApp us