Manhattan · Southbridg
29 Peck Slip, Southbridg, Manhattan: Violations and Building Information
This building has open records with New York City agencies. The full report, with every item, is sent to you by email as a PDF.
The full report, by email
Every open item on 29 Peck Slip, with dates, hearing dates, penalties and status, plus the closed history. The report is never shown on this website; it is sent to the email you enter.
- HPD, DOB, ECB/OATH, FDNY, DEP, Sanitation and Health records
- Source dataset beside each figure
- Free; we never sell your details
About 29 Peck Slip
29 Peck Slip is a hotel in Southbridg, Manhattan, built in 1900, with 5 units, on 7 floors. The lot is 6,204 sq ft, zoned C6-2A.
- Building type
- Hotel (class HB)
- Year built
- 1900
- All units
- 5
- Floors
- 7
- Building floor area
- 39,747 sq ft
- Lot area
- 6,204 sq ft
- Zoning
- C6-2A · special district LM
- Floor area ratio
- 6.41 built of 6.50 allowed
- Historic district
- South Street Seaport Historic District
- Programmes and lists
- Class B / SRO rooms · Sidewalk shed / scaffold up · LL97: emission limits from 2024 · LL88 lighting
- BBL
- 1001070038
Zoning allows more floor area than the building uses: roughly 558 sq ft of unused development rights on paper. Zoning bonuses, overlays and lot conditions change the real number; an architect should confirm it.
From the city’s tax-lot records (DCP PLUTO), DOF, HPD, DOB and HUD programme lists. Zoning map for this lot.
NYC rules that apply here
Based on the building’s size, age and type. These apply whether or not anything is open.
- Class B / SRO roomsHPD records lawful Class B (rooming or single-room-occupancy) units here. Single-room-occupancy buildings need HPD’s Certification of No Harassment before DOB approves most demolition or alteration work. Rooms in older SRO buildings are commonly rent-stabilised.
- Sidewalk shed / scaffold upAn active DOB NOW permit for a sidewalk shed, scaffold or construction fence. A shed is a monthly rental cost, and one that stays up for years usually means facade repairs are stalled. The permit has to be renewed while the shed stands; an expired shed permit is a violation.
- LL97: emission limits from 2024On DOB’s Local Law 97 list under Article 320: emission limits since January 1, 2024, report every May 1.
- LL88 lightingOn DOB’s Local Law 88 list: lighting in non-residential and common spaces had to meet code by January 1, 2025 (and tenant submeters in the largest buildings), with a report to DOB.
- Gas piping inspection every four years (Local Law 152)Every building except one- and two-family homes; the year depends on the community district. Read the guide
- Façade inspection every five years (FISP / Local Law 11)Taller than six stories, so a qualified inspector must examine the exterior walls every five years and file with DOB. Read the guide
- Energy benchmarking and Local Law 97About 39,747 sq ft, over the 25,000 sq ft line: Local Law 84 benchmarking and the Local Law 97 emissions report are due May 1 if the building is on the covered list. Read the guide
- In a historic districtSouth Street Seaport Historic District: exterior work needs a permit from the Landmarks Preservation Commission.
- In a flood zoneInside the 1% annual-chance flood zone on FEMA’s 2015 preliminary maps. Substantial work must meet flood-resistant construction rules, and lenders may require flood insurance.
How NYC violations are cleared
HPD violations
Housing code violations in three classes: C (immediately hazardous, such as no heat or lead paint), B (hazardous) and A (non-hazardous). Each is closed by correcting the condition and certifying the correction to HPD within its deadline.
HPD violation classes and how to clear themDOB violations and ECB summonses
Building code items such as boilers, elevators, gas piping and facades. DOB violations block permits and Certificates of Occupancy until dismissed; ECB summonses also carry a hearing and a penalty.
How to remove a DOB violationOther OATH summonses
Sanitation, environmental, health and fire-code summonses are heard at OATH. Each has a hearing date, and a missed hearing becomes a default at the maximum penalty.
OATH / ECB hearing guideWant it handled? Manhattan violation removal · HPD violation removal · DOB and ECB violation removal · NYC property management
Source: NYC Open Data, compiled by Bulwark and last refreshed 10/24/2026. Records can lag the agencies’ own systems by a day or more. Owner and registration contact details are not shown on this page.
Brooklyn, NY
Own or manage this building? We can clear the open items
Call (888) 756-7874 or get the free full report by email. Then we quote a fixed price for the clearance.
Photo: Andre Carrotflower, CC BY-SA 4.0