Manhattan · Upper West Side
340 West 85 Street, Upper West Side, Manhattan: Violations and Building Information
This building has open records with New York City agencies. The full report, with every item, is sent to you by email as a PDF.
The full report, by email
Every open item on 340 West 85 Street, with dates, hearing dates, penalties and status, plus the closed history. The report is never shown on this website; it is sent to the email you enter.
- HPD, DOB, ECB/OATH, FDNY, DEP, Sanitation and Health records
- Source dataset beside each figure
- Free; we never sell your details
About 340 West 85 Street
340 West 85 Street is a hotel in Upper West Side, Manhattan, built in 1927, with 1 unit, on 9 floors. The lot is 7,663 sq ft, zoned R8B.
- Building type
- Hotel (class HH)
- Year built
- 1927
- All units
- 1
- Floors
- 9
- Building floor area
- 51,520 sq ft
- Lot area
- 7,663 sq ft
- Zoning
- R8B
- Floor area ratio
- 6.72 built of 4.00 allowed
- Historic district
- Riverside-West End Historic District Extension I
- Programmes and lists
- HDFC (Article XI) · Class B / SRO rooms · HPD affordable project · Sidewalk shed / scaffold up · LL97: emission limits from 2024 · LL87 energy audit · LL88 lighting
- BBL
- 1012460049
From the city’s tax-lot records (DCP PLUTO), DOF, HPD, DOB and HUD programme lists. Zoning map for this lot.
NYC rules that apply here
Based on the building’s size, age and type. These apply whether or not anything is open.
- HDFC (Article XI)A Housing Development Fund Corporation under Article XI of the NY Private Housing Finance Law: usually a limited-equity co-op that the city sold to its tenants, or a non-profit-owned affordable building. Run by a resident board, usually volunteers, so the compliance calendar is the board’s job and often falls behind. The property-tax exemption is tied to a regulatory agreement with HPD, which can step in if the building is mismanaged or in distress.
- Class B / SRO roomsHPD records lawful Class B (rooming or single-room-occupancy) units here. Single-room-occupancy buildings need HPD’s Certification of No Harassment before DOB approves most demolition or alteration work. Rooms in older SRO buildings are commonly rent-stabilised.
- HPD affordable projectBuilt or preserved with HPD financing or incentives since 2014 (HPD Affordable Housing Production). A regulatory agreement sets income bands and rents for the counted units. Vacancies are generally filled through Housing Connect, with income certifications.
- Sidewalk shed / scaffold upAn active DOB NOW permit for a sidewalk shed, scaffold or construction fence. A shed is a monthly rental cost, and one that stays up for years usually means facade repairs are stalled. The permit has to be renewed while the shed stands; an expired shed permit is a violation.
- LL97: emission limits from 2024On DOB’s Local Law 97 list under Article 320: emission limits since January 1, 2024, report every May 1.
- LL87 energy auditOn DOB’s Local Law 87 list: an energy audit and retro-commissioning report every ten years, the year set by the block number’s last digit.
- LL88 lightingOn DOB’s Local Law 88 list: lighting in non-residential and common spaces had to meet code by January 1, 2025 (and tenant submeters in the largest buildings), with a report to DOB.
- Gas piping inspection every four years (Local Law 152)Every building except one- and two-family homes; the year depends on the community district. Read the guide
- Façade inspection every five years (FISP / Local Law 11)Taller than six stories, so a qualified inspector must examine the exterior walls every five years and file with DOB. Read the guide
- Energy benchmarking and Local Law 97About 51,520 sq ft, over the 25,000 sq ft line: Local Law 84 benchmarking and the Local Law 97 emissions report are due May 1 if the building is on the covered list. Over 50,000 sq ft, a Local Law 87 energy audit is due every ten years. Read the guide
- In a historic districtRiverside-West End Historic District Extension I: exterior work needs a permit from the Landmarks Preservation Commission.
How NYC violations are cleared
HPD violations
Housing code violations in three classes: C (immediately hazardous, such as no heat or lead paint), B (hazardous) and A (non-hazardous). Each is closed by correcting the condition and certifying the correction to HPD within its deadline.
HPD violation classes and how to clear themDOB violations and ECB summonses
Building code items such as boilers, elevators, gas piping and facades. DOB violations block permits and Certificates of Occupancy until dismissed; ECB summonses also carry a hearing and a penalty.
How to remove a DOB violationOther OATH summonses
Sanitation, environmental, health and fire-code summonses are heard at OATH. Each has a hearing date, and a missed hearing becomes a default at the maximum penalty.
OATH / ECB hearing guideWant it handled? Manhattan violation removal · HPD violation removal · DOB and ECB violation removal · Property management in Upper West Side
Source: NYC Open Data, compiled by Bulwark and last refreshed 10/24/2026. Records can lag the agencies’ own systems by a day or more. Owner and registration contact details are not shown on this page.
Brooklyn, NY
Own or manage this building? We can clear the open items
Call (888) 756-7874 or get the free full report by email. Then we quote a fixed price for the clearance.
Photo: Andre Carrotflower, CC BY-SA 4.0