Manhattan · Flatiron
4 East 28 Street, Flatiron, Manhattan: Violations and Building Information
This building has open records with New York City agencies. The full report, with every item, is sent to you by email as a PDF.
The full report, by email
Every open item on 4 East 28 Street, with dates, hearing dates, penalties and status, plus the closed history. The report is never shown on this website; it is sent to the email you enter.
- HPD, DOB, ECB/OATH, FDNY, DEP, Sanitation and Health records
- Source dataset beside each figure
- Free; we never sell your details
About 4 East 28 Street
4 East 28 Street is a residential care facility in Flatiron, Manhattan, built in 1904, with 227 units, on 12 floors. The lot is 7,406 sq ft, zoned C5-2.
- Building type
- Residential care facility (class N2)
- Year built
- 1904
- All units
- 227
- Floors
- 12
- Building floor area
- 69,289 sq ft
- Lot area
- 7,406 sq ft
- Zoning
- C5-2
- Floor area ratio
- 9.36 built of 10.00 allowed
- Historic district
- Madison Square North Historic District
- Programmes and lists
- Class B / SRO rooms · Rent-stabilised units · Sidewalk shed / scaffold up · LL97 Article 321 · LL87 energy audit · LL88 lighting
- BBL
- 1008570075
Zoning allows more floor area than the building uses: roughly 4,740 sq ft of unused development rights on paper. Zoning bonuses, overlays and lot conditions change the real number; an architect should confirm it.
From the city’s tax-lot records (DCP PLUTO), DOF, HPD, DOB and HUD programme lists. Zoning map for this lot.
NYC rules that apply here
Based on the building’s size, age and type. These apply whether or not anything is open.
- Class B / SRO roomsHPD records lawful Class B (rooming or single-room-occupancy) units here. Single-room-occupancy buildings need HPD’s Certification of No Harassment before DOB approves most demolition or alteration work. Rooms in older SRO buildings are commonly rent-stabilised.
- Rent-stabilised unitsThe DOF property tax bill lists rent-stabilised units in this building. Every stabilised unit must be registered with DHCR each year, with the rent roll. Increases follow the Rent Guidelines Board; leases, renewals and riders use the required forms.
- Sidewalk shed / scaffold upAn active DOB NOW permit for a sidewalk shed, scaffold or construction fence. A shed is a monthly rental cost, and one that stays up for years usually means facade repairs are stalled. The permit has to be renewed while the shed stands; an expired shed permit is a violation.
- LL97 Article 321On DOB’s Local Law 97 list under Article 321 (certain affordable housing and houses of worship). Instead of yearly caps, a one-time compliance: the listed prescriptive energy measures, or meeting the 2030 limits, documented in a report to DOB. The report was due in 2025; DOB issues violations to buildings that did not file.
- LL87 energy auditOn DOB’s Local Law 87 list: an energy audit and retro-commissioning report every ten years, the year set by the block number’s last digit.
- LL88 lightingOn DOB’s Local Law 88 list: lighting in non-residential and common spaces had to meet code by January 1, 2025 (and tenant submeters in the largest buildings), with a report to DOB.
- Gas piping inspection every four years (Local Law 152)Every building except one- and two-family homes; the year depends on the community district. Read the guide
- Façade inspection every five years (FISP / Local Law 11)Taller than six stories, so a qualified inspector must examine the exterior walls every five years and file with DOB. Read the guide
- Energy benchmarking and Local Law 97About 69,289 sq ft, over the 25,000 sq ft line: Local Law 84 benchmarking and the Local Law 97 emissions report are due May 1 if the building is on the covered list. Over 50,000 sq ft, a Local Law 87 energy audit is due every ten years. Read the guide
- In a historic districtMadison Square North Historic District: exterior work needs a permit from the Landmarks Preservation Commission.
How NYC violations are cleared
HPD violations
Housing code violations in three classes: C (immediately hazardous, such as no heat or lead paint), B (hazardous) and A (non-hazardous). Each is closed by correcting the condition and certifying the correction to HPD within its deadline.
HPD violation classes and how to clear themDOB violations and ECB summonses
Building code items such as boilers, elevators, gas piping and facades. DOB violations block permits and Certificates of Occupancy until dismissed; ECB summonses also carry a hearing and a penalty.
How to remove a DOB violationOther OATH summonses
Sanitation, environmental, health and fire-code summonses are heard at OATH. Each has a hearing date, and a missed hearing becomes a default at the maximum penalty.
OATH / ECB hearing guideWant it handled? Manhattan violation removal · HPD violation removal · DOB and ECB violation removal · NYC property management
Source: NYC Open Data, compiled by Bulwark and last refreshed 10/24/2026. Records can lag the agencies’ own systems by a day or more. Owner and registration contact details are not shown on this page.
Brooklyn, NY
Own or manage this building? We can clear the open items
Call (888) 756-7874 or get the free full report by email. Then we quote a fixed price for the clearance.
Photo: Andre Carrotflower, CC BY-SA 4.0